Thomas Moore's interactive media studies
Labels
Monday, 12 June 2017
location release
Location Release
Having full authority to do so, I hereby grant Tom Moore permission to use the property at W9 for the purposes of photographing and recording scenes for the
production
during the hours of 9-4 on the following days: Monday, Wednesday, Thursday
.
Permission includes, but is not limited to, the right to bring cast, crew, equipment, props and
temporary sets onto the premises for the time specified. I understand that all items brought onto
the premises will be removed at the end of the production period and that the location will be
fully returned to its original condition.
It is further understood that any damage to the property will become the responsibility of the cast
and crew.
Crew Member Tom Moore
Signature: t.moore Printed name: THOMAS MOORE
Title: Address: ENSFC. NR31 7BQ
Phone number: 07747017130 Date: 05/05/17
Property/Location Owner
Signature: TMOORE Printed name: THOMAS MOORE
Title: Address: 4 Orde way Hopton
Phone number: 07747017130 Date: 05/05/17
location reece
PRODUCTION Screen capture SHEET NO. 4
SCOUT DATE 05/05/17
LOCATION: w9
SITE w9
ADDRESS east norfolk college
PHONE NO. 07747017130
CONTACT 07747017130
AVAILABILITY:
DAYS OF THE WEEK monday, wednesday, thursday
TIMES OF THE DAY lessons
SPECIAL ARRANGEMENTS reserved computer
PARKING:
DISTANCE/TIME FROM HOME:
POWER CAPABILITIES:
OBSERVATIONS:
MINOR RELEASE
MINOR MODEL/PERFORMER RELEASE AGREEMENT
Date/s of production/s: 05/5/17
Photographer name: Tom Moore
Talent:
Address: W9
Phone No: 07747017130
Age of Talent (at time of production): 16
Description of production/s: screen capture reecording
I hereby grant to (“Photographer”), the absolute right and permission to
take, use, reuse, publish, and republish the minor’s image, this will include the use of the image
or likeness on one of the College’s YouTube or Vimeo channels or official website.
I hereby agree that I am over 18 years of age and have every right to sign for the minor. I state
further that I have read this release and that I am fully familiar with its contents.
Parent or Guardian’s Signature:
Parent/Guardian Name: Chris Moore
Email address:
Parent or Guardian phone (if differs from minor) 07745024160
Witness Signature K.moore
Witness Name(print): KEITH MOORE
Sunday, 4 June 2017
Evaluation
For assignment three I was set the task of designing a website of my choosing on powerpoint, the website must contain at least three working pages, a logo,
a video and some form of navigation. The logo is a rather simple design but the colours are very faded and fit with my overall style. and the nav bar is a very simple design which blends in very well.
I had a complete change of my ideas, I originally wanted to make a snowboard website but I thought that I may swell use the task to show the different aspect of my graphic design skills. I think that my website turned out very well i received a lot of positive feedback, for example I was told that "it looks very professional and modern". I was also told that the "colours and textures for the background complimented my work and didn't take any focus away from the products being promoted"
I think that the project went extremely well, i was ill and also in other subjects exams, resulting in me missing two full weeks of lessons but i still in just two lessons managed to produce a very high quality design whilst meeting the deadline. I don't feel like there were many areas that didn't go smoothly, Maybe I could've ensured that all of my designs were the same size to ensure that they looked more even on the page but that is something that would've been changed if there was more time.
I think that my website runs very smooth will all hyperlinks functioning perfectly and smoothly. My website is very creative, I feel that it fits very well with my style and matches the clean simplistic style of my designs. Again i feel that my website is very pleasing to look like, it is very smooth and modern and all of the colours compliment each other perfectly. I had both positive and negative feedback on my website, I was told that "it was a bit too long" but this was countered by it being "the right speed to see the different techniques and skill".
I feel that the video allowed me to show another side of my graphics style but in a more interesting way than just more photographs plus it makes the website more interactive and interesting.
If i waste redo this task, I would've started quicker and spent longer perfecting the little imperfections to ensure that it was as good as i could make it. During this project all of my work was saved on a memory stick which i kept in a separate compartment of my bag to ensure it was always with me as i never go to college without a bag. In this project I used Adobe Illustrator to create my logo, Photoshop to do the illustrations, social icons, background and banner, then I used Powerpoint to assemble my design and finally Premier Pro to create the video.
I used a range of file types like JPEG's for the images of the illustrations, PDF for the logo and MP4 for the video. For this project i had to fill out a risk assessment, including a computer misuse form. to meet with the laws and forms, i made suer that i strictly stuck on task and did everything securely, i didn't need internet access for this project, so i didn't use it and i made sure that i used protected software.
a video and some form of navigation. The logo is a rather simple design but the colours are very faded and fit with my overall style. and the nav bar is a very simple design which blends in very well.
I had a complete change of my ideas, I originally wanted to make a snowboard website but I thought that I may swell use the task to show the different aspect of my graphic design skills. I think that my website turned out very well i received a lot of positive feedback, for example I was told that "it looks very professional and modern". I was also told that the "colours and textures for the background complimented my work and didn't take any focus away from the products being promoted"
I think that the project went extremely well, i was ill and also in other subjects exams, resulting in me missing two full weeks of lessons but i still in just two lessons managed to produce a very high quality design whilst meeting the deadline. I don't feel like there were many areas that didn't go smoothly, Maybe I could've ensured that all of my designs were the same size to ensure that they looked more even on the page but that is something that would've been changed if there was more time.
I think that my website runs very smooth will all hyperlinks functioning perfectly and smoothly. My website is very creative, I feel that it fits very well with my style and matches the clean simplistic style of my designs. Again i feel that my website is very pleasing to look like, it is very smooth and modern and all of the colours compliment each other perfectly. I had both positive and negative feedback on my website, I was told that "it was a bit too long" but this was countered by it being "the right speed to see the different techniques and skill".
I feel that the video allowed me to show another side of my graphics style but in a more interesting way than just more photographs plus it makes the website more interactive and interesting.
If i waste redo this task, I would've started quicker and spent longer perfecting the little imperfections to ensure that it was as good as i could make it. During this project all of my work was saved on a memory stick which i kept in a separate compartment of my bag to ensure it was always with me as i never go to college without a bag. In this project I used Adobe Illustrator to create my logo, Photoshop to do the illustrations, social icons, background and banner, then I used Powerpoint to assemble my design and finally Premier Pro to create the video.
I used a range of file types like JPEG's for the images of the illustrations, PDF for the logo and MP4 for the video. For this project i had to fill out a risk assessment, including a computer misuse form. to meet with the laws and forms, i made suer that i strictly stuck on task and did everything securely, i didn't need internet access for this project, so i didn't use it and i made sure that i used protected software.
Thursday, 25 May 2017
Subscribe to:
Comments (Atom)